Bulk Transport Equipment | Charlton QLD

Charlton, Queensland

Clearspan Building Solutions provided a turnkey industrial solution for BTE.

PROJECT OVERVIEW

Clearspan Building Solutions provided a turnkey construction solution for Bulk Transport Equipment including the design and construction of their 1100m2 industrial building.  We also assisted with the procurement of infrastructure specific to their operations including an overhead gantry crane and office fitout.

 

AT A GLANCE

  • Design and construction of 1100m2 industrial shed with 2 storey office/amenities
  • Overseeing and co-ordinating all statutory fees and permits
  • Preliminary building design
  • Structural, civil and hydraulic engineering documentation
  •  Earthworks
  • All concrete work
  • Fabrication of structural steelwork
  • Procurement of overhead gantry crane
  • Roller shutters and personnel doors
  • Steel sliding doors
  • Supply of all materials
  • Office fit-out including joinery
  • Commercial glazing
  • Plumbing, drainage and fire services
  • Electrical